SitehelmSitehelmOpen Sitehelm FreeFree

Part L photos for new homes

Last checked 24-10-2026. A plain guide, not legal advice: check the official guidance below for your job.

Since June 2022, Approved Document L in England asks for photographic evidence of how the energy-saving details on each new home were built. The photos go to the energy assessor for the BREL report and are available to building control.

What it is for

The aim is to close the gap between the design and what is built. Photos taken as the work goes in show that insulation, airtightness and the junctions were built as designed, before they are covered up.

What to photograph

Take clear photos of each plot, at the stage each detail is visible, typically:

  • ground floor insulation and its edge details
  • wall insulation, including at corners, around openings and at the junctions with floors and roofs
  • roof and loft insulation, including at the eaves
  • windows and doors fitted, with their seals and cavity closers
  • airtightness details and service penetrations
  • heating and hot water: insulated pipework, cylinder and ventilation as installed

Check the list your energy assessor and building control body expect: the details vary with the design.

Make the photos useful

Each photo should show the plot and the detail clearly, with something for scale where it helps, and be dated. Keep them in order, plot by plot, so nothing is missed when the work is covered up.

Getting them to the assessor

The energy assessor uses the photos to produce the BREL report at completion. Agree early how they want them, and send them plot by plot rather than all at the end.

Sources

Tools that help

More guides

Every guide

Run the job, not the paperwork.

Measure from a drawing, Easy CAD, Edit PDF and Weather are free for good in your browser. Take-off, RAMS, quotes, invoices and 40+ more tools come with Sitehelm PRO.