Surface preparation and application of paints, stains and wall coverings to internal and external surfaces at the site, by brush, roller or spray, working from steps, podiums, towers or scaffold as required.
Risk assessment
Risk = severity × likelihood, each from 1 to 5. 1 to 3 is low, 4 to 6 medium, 8 to 12 high and 15 to 25 very high.
| Hazard | Who might be harmed and how | Risk | Controls | With controls |
|---|---|---|---|---|
| Falls from steps, towers or scaffold | Operatives painting at height may fall from steps, towers or scaffold, causing serious or fatal injury. | 5 × 3 = 15 Very high |
| 5 × 1 = 5 Medium |
| Disturbing lead paint during preparation | Operatives sanding or burning off old paint may ingest or inhale lead, causing lead poisoning. | 4 × 3 = 12 High |
| 4 × 1 = 4 Medium |
| Solvent vapour inhalation | Operatives using solvent-based paints in enclosed rooms may inhale vapour, causing dizziness or ill health. | 3 × 3 = 9 High |
| 3 × 1 = 3 Low |
| Disturbing asbestos-containing coatings | Operatives preparing textured coatings or old boards may disturb asbestos, causing serious lung disease. | 5 × 2 = 10 High |
| 5 × 1 = 5 Medium |
| Fire from solvents, heat guns and rags | Operatives and others may be injured by fire from heat guns, solvents or oily rags self-heating. | 4 × 2 = 8 High |
| 4 × 1 = 4 Medium |
| Paint and chemical contact with skin or eyes | Operatives may get paint, strippers or mist in the eyes or on skin, causing burns or dermatitis. | 3 × 3 = 9 High |
| 3 × 1 = 3 Low |
| Dust from sanding filler and surfaces | Operatives sanding filler and prepared surfaces may inhale dust, causing respiratory irritation. | 3 × 3 = 9 High |
| 3 × 1 = 3 Low |
| Manual handling of paint tins and equipment | Operatives carrying tins, steps and boards may suffer back or shoulder strain. | 2 × 3 = 6 Medium |
| 2 × 1 = 2 Low |
| Slips on dust sheets and spills | Operatives may slip on loose dust sheets or spilt paint, causing sprains or fractures. | 3 × 3 = 9 High |
| 3 × 1 = 3 Low |
Weather: External coatings only in dry conditions within the manufacturer's temperature range; stop in high winds.
Method statement
Supervision and briefing
Operations will be controlled by a competent supervisor. Painting and decorating will be carried out by experienced, competent decorators.
All operatives involved will be briefed on:
- Safe working at height procedures
- COSHH requirements for each product
- Lead and asbestos precautions when preparing existing surfaces
- Fire precautions for solvents and rags
- Emergency procedures
PPE
- Safety boots
- Gloves suitable for the product
- Hi-visibility clothing
- Eye protection where necessary
- Overalls
- RPE (FFP3 for dust; solvent filters for spray work)
Plant and equipment
- Podium steps/stepladders/mobile tower
- Brushes, rollers and extension poles
- Sanders with on-tool extraction
- Dust sheets and masking materials
- Lead paint test kit
- Fire extinguisher
- First aid kit
Things to watch for
Existing surfaces at the site will be checked for lead paint and asbestos before any preparation starts.
Particular care must be taken to avoid:
• Falls from access equipment
• Disturbing lead paint or asbestos-containing coatings
• Solvent vapour build-up in enclosed rooms
• Fire from solvents and oily rags
Products and colours will be confirmed against the specification, and occupied areas agreed with the client before work starts.
Working conditions
Rooms will be ventilated during and after application. Wet paint will be signed, occupied areas kept separate, and flammable products stored in a secure, ventilated store.
Access
Access to the work area is via the the site building interior or scaffold as applicable. Paints and equipment will be moved by hand or trolley; no carrying tools up ladders.
Where the work is
Internal rooms and external elevations of the site; paint store and wash-up area agreed on site.
Sequence of work
- Brief operatives, check the specification, COSHH assessments and survey information.
- Test existing coatings for lead where the building is older.
- Set up access equipment and lay and secure dust sheets.
- Mask off and protect adjacent surfaces and fittings.
- Prepare surfaces: clean, fill and sand using extraction or wet methods.
- Apply primers and undercoats as specified.
- Apply finish coats, keeping rooms ventilated.
- Hang wall coverings where specified.
- Inspect finishes and complete snagging.
- Clean equipment; dispose of waste paint and rags safely.
- Remove masking and dust sheets and secure the work area.
Emergencies
Stop work immediately, make the area safe, move people out of danger, report it to the site manager or supervisor, and call 999 if anyone is hurt or in danger.
References
COSHH 2002; Control of Lead at Work Regulations 2002; Control of Asbestos Regulations 2012; Work at Height Regulations 2005; BS 6150.