Excavation and muck-away calculator
How much comes out of the ground once it's dug: the volume in the ground, the bulked volume by soil type, the tonnes, and the skips or grab lorry loads to take it away.
Put these calculators on your phone, free
They work like an app from your home screen, even with no signal on site. On an iPhone: tap Share, then Add to Home Screen. On Android: tap the menu (⋮), then Add to Home screen or Install app.
The free SiteHelm phone app for iPhone and Android is on its way, with every calculator in it. Tell me when it's out
Do more with SiteHelm PRO
Measure the trenches straight off the drawing with Take-off, put the dig and muck-away into your quote from the Book of rates, and keep the waste transfer notes with the job.
Free on your phone. Every builders' calculator will be free in the SiteHelm phone app for iPhone and Android, coming soon. Tell me when it's out.
Every builders' calculator is in SiteHelm PRO for your Windows PC, alongside take-off, RAMS, quotes, invoices and 40+ more tools. The first 100 get a free 1-year licence.
Worked example
A foundation trench 14 m long, 600 mm wide and 1 m deep in clay:
10.92 m³ to take away once dug
- 8.40 m³ in the ground × 1.30 bulking for clay
- About 16.8 tonnes
- 2 × 8 yard skips, or 2 grab lorry loads (about 16 t each)
How the sum works
The volume in the ground is length × width × depth. Once dug, soil loosens and takes up more room: that's bulking. The calculator multiplies by a typical bulking factor for the ground you choose (about 1.25 for topsoil, 1.3 for clay, 1.15 for sand or gravel, 1.4 for chalk, 1.3 for mixed made ground and 1.5 for soft rock). If you know your own figure, type it in.
Tonnes come from a typical in-ground density for each type (about 1.9 to 2.1 t per m³ for most soils). Skips hold about 4.6, 6.1 or 9.2 m³ for 6, 8 and 12 yards; a grab lorry is counted at about 16 tonnes a load.
Before you book it
Bulking factors and densities vary with the ground and how wet it is, so treat the figures as a good estimate. Skip firms limit the weight as well as the volume, and many won't take heavy soil in a big skip: ask before you book. Spoil kept on site must be stored away from the edge of the excavation (see HSE on excavations), and muck-away needs the right waste paperwork.